We are working on a large project with over 50 links and least 5 pasives (3 flat boards and 2 back to backs). I have no problem creating the links with the passives and saving them with a different name. But when I go back to the network view and try to recall the links, the network module tries to reconcile the difference between the separate links and the new joined links. When I perform the interference calculations which link will be used? What can I do so that whenever I click on a link in the network view it jumps to the composite link?
Thanks for your comments,
Puzzled in Panama.
Thanks for your comments,
Puzzled in Panama.